This is to certify thats M/s. Almonard Private Limited has completed Design, Supply, Installation & Commissioning of Fume extractions system for milk boiling area at our works successfully sufficient trials has been taken & performance of system found satisfactory.

- Kamaths Ourtimes Icecreams Pvt. Ltd.

This is to certify that M/s. Almonard Pvt. Ltd, Mumbai have successfully designed, Installed and commissioned "Dust Free Pressurization System" at our stamping room of our works. Sufficient number of trials have been and performance of the system is found satisfactory.

- Reneta Plastics

With reference to the above purchase order for Painting Booth we here by certify that Painting Booth supplied to us are found satisfactory.

- Steel Strong Valves Pvt. Ltd.

We hereby inform you that Mr. C. Antony Babu from Chennai, Visited our factory and by his suggestions we had carried out some modifications in duct & have got 60-70% result and hence problem of exhaust fume shucking is solved by the same percentage.

- Rajhans Impex Pvt. Ltd.

Wet Scrubber and kitchen Exhaust Fan Spplied by you to Taj Calicut Hotel have been duly repaired and the noise level is reduced to the permissible limit as per our order. Now both the units have been tested and they are found satisfactory.

- The Indian Hotels Company Limited

With reference to the above, We are pleased to inform you that the Air Washer System of 80000 CMH capacity supplied by you for L & T Cement Plant at Tadpatri – A.P. is working satisfactorily for the past two years.

- Larsen & Toubro Limited

The Person Mr. Natarajan (M/S Almonard Pvt Ltd) has completed the assembly work of air washer booth system (Qty.: -2nos) with satisfaction. Air washer booth is now in good condition.

- Essar Steel Limited

This is to certified that M/s. Almonard Pvt Ltd. Mumbai have successfully designed supplied erected & commissioning that Dust Collector Sustem for our Wire drawing Machine at our khopoli works and performing satisfactory.

- IPM Industries Pvt. Ltd.

"Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock. Aldus PageMaker including versions."

- IPM Industries Pvt. Ltd.

The Humidificatio sizes were type Venatilation System was installed & commissioned successfully on 04/12/2003 in line with the Approved Drawing (Drg. No:AL/VELL/119/03 Dated 23/10/2003). The Ducting sizes were cheked physically & measurement sheet for for actual ducting quantity received at site was prepared & sigend.

- Varros Engineering Pvt. Ltd.

This is to certify that M/s Almonard Pvt. Ltd. Mumbai have successfully designed supplied & commissioned the dust collection system of works. Sufficient no. of trails has been taken & performance of the system is found satisfactory

- Patel Alloy Stell Pvt. Ltd

This to certify that the Ventilation System for Printing Press Room designed by your Mr. Amit Mistry (Engineer-Mktd. & Project) is successfully installed and is working satisfactory. Also, we are happy with the performance of the system & work done by M/s Almonard Limited.

- Uchitha Graphic Printers Pvt. Ltd.

This is certify That Ventilation System for our Boiler & Burner area supplied by M/s. Almonard Private Limited Mumbai is commissioned & performing satisfactorily.

- Laminators India

This is to certify that Dust Collection System for Polishing machine supplied by M/s. Almonard Limited – Chennai vide our P.O.No. B01/340400447 Dated: 10.10.2003 is commissioned & performing satisfactorily.

- Hindalco Industries Limited

This is to certify that Mr. Amit Mistry of Almonard Limited Has Successfully designed, erected and commissioned Dust Extraction System in our board cutting machines at Aghai Plant. The System works satisfactorily and we are happy with the work done By M/s. Almonard limited.

- Orientel Veneer Products Ltd.

This is to certify that kitchen exhaust & supply system at an Mayesh MLA canteen Snack Kitchen area installed & supplied by M/S. Almonard Ltd is working satisfactorily.

- Hotel Majestic Amdar Niwas

Our PO No:KPW/PUR/094/98-99 dt. 3.11.98 for the supply installation & commissioning of 1,00,000 CFM capacity Pressurisation system. We hereby confirm that the 1,00,00 CFM capacity pressurization system commissioning you is running to our satisfication.

- Kanji Precision Works Pvt. Ltd.

Supply Dust Collector Commissioning at taloja plant J-29, On dated 03/11/2006 and working satisfactory & under observation.

- Walplast Products Pvt. Ltd.

This refers to dust collector system provided by Almonard As P.O No. ZIRPL/0607/ 04 Dated 09.05.06 to attended Mr. Deepak Mikumbh has done the commissioning of bag filter unit with centrifugal blower.

- Zenith Industrial Rubber Product Pvt. Ltd.

This is to certify that Mr. C. Antony babu of M/s. Almonard Pvt. Ltd. Mumbai have successfully completed the work of modification of Emission Control System.

- Rajhans Metal Pvt. Ltd.

Mr. Deepak Nikumbh had visited our side at mazgaon Dock on 21/3/07 and he inspected Dust Collection & Re commissioning System and ourside satisfactory result and system running good system.

- Ajanta Surface Treatment Pvt. Ltd.

This is to inform you that your team has completed the erection work of 12 Roof Extractor Jagtap.

- HR Johnson India

This is to certify that M/s. Almonard Pvt. Ltd. Mumbai. Have successfully designed. Installed commissioning scrubber unit at our Foundry room of our works.

- Jay Bhawani Metal Industries

We feel very glad to inform you that our Ferrous / Aluminum 125Kw Furnace sintering has successfully completed. With this now, our Aluminum (100Kg) & Ferrous (300kKg) are in workable conditions. We would like to thanks you & your team for their help.

- Rico Auto Industries Limited

Your Supplied Scrubber system is erected & commissioned on 5th Dec, 2007, found result satisfactory. The Performance test trail will be conducted within week span.

- Cooper Foundry Pvt. Ltd

Thank you for deputing your engineer and team for errection of fume exhaust system supplied by you, installation and errection works has been completed on 31st December 2007 and worl done by your work force has been found satisfactory. Further for commissioning and trial of your machine we will let you know within a week time.

- Siyaram Impex Pvt. Ltd.

Eraction work is completed. Now we request you told on engineer for testing commissioning often 17th on jan 2008.

- Accurate Industries

This is to inform that the Fume Extractor at pouring Bay is Fulfilling the acceptance criteria as per SOS for Pt. No. 4.1, 4.3, & 4.4 for 4.2. The resample taken today after modification by M/s Almonard on 13th July 2008. This was RPSM level at Fumes discharge pint from the equipment. The report is expected by Tuesday 22nd July 2008. Based on report we can decide for the clearance of the equipment.

- Mahindra Automotive Industry

We certificate Mr. Antony Babu & three Person as completed the G.I. Ducting Fabrication & Erection Work (Supply Air) is Properly done.

- Manish Packaging Pvt. Ltd.

Please note that the painting booth supplied by you is installed at our sanand work by your engineers successfully and is working satisfactorily.

- Shayburg Valves Pvt. Ltd.

This is to certify that the pressurization system designed and supplied by you has been commissioned at factory site. The Performance trials were conducted and found giving satisfactory performance.

- Winsel Aqua's Pvt. Ltd.

This is to certify that Mr. Basheer Ahmad & Mr. Idaya Chandran, site Engineers of M/s. Almonard Pvt. Ltd. Mumbai have susseccfully completed the erection of work of our two fume exhaust system, Further, for commission of the same we will inform you as soon as our Fumace gets installed.

- Rajhans Alloys Pvt. Ltd.

As a regarding visit to your plant (chhatral) by Mr. Basheer Ahmad his service unit completely, testing is ok and work is satisfy.

- Gujrat Flotex Pvt. Ltd.

This is to certify that Mr. A. Idhaya chandran (Site Engineer) & this team from ALmonard Chennai, has successfully completed the erection and commissioning of the paint booth on 03 jan 2011 to our satisfaction.

- Balmar lawrie & Co. Ltd.

Mr. Bashir and team had finished errection, testing and commissioning of fumrexost system at our plant.

- G.H. Industries

Almonard team was erected 8nos Roof Exhaust system in our plant at Jamnagar and it is running successfully. We are satisfied it is Performance.

- Apple International

This is to kind informing you that your people have been install dust collector unit properly.

- Rado Brass Industries

The Almonard Pressurized Air System installation completed in our plant-4 on 30th Sept 2011 by the Almonard erection team. Checked the entire system and found working satisfactorily.

- AB Mauri india Pvt. Ltd.

Roof Extractor Erection work completed – 3 (nos). We are satisfied it is Performance.

- Kerala State Rubber Co-operative Ltd.

With reference to the above, this is to inform you that the labour work for fixing of Fume Exhaust System for Furnace is completed.

- Veekesy Sandals (India) Pvt. Ltd.

This is to certify that M/s. Almonard Pvt Ltd has successfully completed humidification type ventilation system in G- Building and further the system is working satisfactory.

- Vishay Components India Pvt. Ltd.